Sunday, September 16, 2007

Theatre Education Part 1: How We Got Here

There’s a series of posts appearing over here. I can’t remember where I found them; probably it was a Google Alert on stagehand. For the Green Page I have alerts set with Google and Yahoo on “Stagehand” and “IATSE” as they seemed like to fairly uncommon words that are significant to me. I cross posted one of the articles to the Green Page, and the author tracked it back and left a comment. I always think it’s cool when that happens. Next, several students read that piece and chose to comment on it for their weekly Green Page commitment. This year we have a Freshman, Sophomore, and a Junior class all required to follow the page and do five comments a week as verification. I think its coming along nicely. We’re actually getting some cross-talk going and I think community awareness is building – and that was the whole point. Some of the Seniors are even still reading even though we don’t have a requirement for them.

So after several students comment on how CMU is developing in reference to the original article, the original author placed another comment asking for some specific examples of what they were talking about. I then emailed him and he emailed me and I sent him the answers which he asked if he could post. Being that I am as conceited as any other blogger, and also because there were some details that ought to be redacted, and to allow me to add a little bit more I suggested that I would post here and he could link to me, and I would link back to him and we could have our own little promotion party.

So here we are.

Here’s the starting point: Theatre Ideas: Theatre Education Part 1: How We Got Here

And here are the student comments: News From the “Real World”: Theatre Education Part 1: How We Got Here

Here is the question:

David -- I am looking for theatre departments that have created a curriculum that would help students question the status quo, think outside the box, and lead them to explore the larger questions that inform the practice of theatre. In other words, a curriculum that helps students to knowledgeably create their own aesthetic and worldview rather than develop skills that simply fit into the current aesthetic and worldview. Several people seemed to post about CMU, so I was curious how this was happening!

And here, is the answer:

So I should set this up by saying that we've been in the midst of something like a 4 year process of enforced navel gazing. CMU has an advisory board system and the last advisory visit produced a report that said that we weren't necessarily supporting our mission and that curricular decisions didn't always make sense internally or in how they interfaced with production. Coming out of that were a Mission/Vision project and a top to bottom curricular review. I don't think that in the absence of that process that we would have come to be thinking about many of the things that lead to some of the changes students were talking about on the green page.

The mission is about what you'd think it would be. The more important thing was the group produced five supporting "pillars" of that mission. For all the decisions that followed we always measure the ideas against the rubric of the pillars. Those pillars are: Education, Leadership, Experimentation, Diversity, and Community. I'm sure that sounds bland and it's true that nearly everything can be fit into Education or Community, but having them as a measuring stick really has forced us to evaluate decisions about curriculum, pedagogy, and production with a much clearer focus.

Also, having a rubric at all gave us permission to throw out "that's how it's done" as justification for anything.

So, some examples of how that played out…

Season Selection. We've completely turned upside down our season selection process. Instead of having standard scope of production and a "big show in the big theatre" mentality each teacher submits a "lab request" detailing the kind of experience they feel like their students need at that time. The requests are then "matched" into productions of all flavors. The result of this has already produced a "mainstage" in our studio, an off site, site-specific production, a multi-venue, multi aesthetic Orestia, and this year a period, traveling Comedia wagon. There's still the more traditional discussion of titles, but the new process has really thrown open the range of possible modes of outcome.

Playground. We've instituted a student festival. For one week each year we cancel all classes and students can mount their own projects start to finish. Really the only parameters are that it has to happen during that week, it has no budget, and it must include at least one School of Drama student. At the end of the week, the shows are presented in a sort of marathon-fringe. We've had cabarets, 90 minute versions of just about every kind of play or musical, we've had site-specific work, murals, light shows – last year there was a game of Monopoly "performed" on a 30'x30' board in our lobby. Students are encouraged to cross disciplines: designers direct, technicians act, and so on. For the part of the population that doesn't elect to simply take the week off it's been electric.

Hit/Lit/Crit. In the curricular review we committed to making course content in History, Literature, and Criticism equally important as craft and skills. Along with this we placed a real emphasis on writing. The consensus was that these fundamentals were critical for students to be able to produce more than the status quo. We're also working with other schools here in the College of Fine Arts on a sort of "Connections" style Arts Histories class tying art of all kinds to history and context. In the School of Drama all students have to take six semesters of Drama Lit.

Basic PTM/PINO. In Design & Production we've always had a Basic Design class. This class abstracts the elements of design that will be applied to theatre on down the road: line, shape, symmetry, color. As part of the curricular review we created a similar course for Production. One semester abstracts technical subjects: tension, compression, shear, mass, acceleration, frequency, amplitude. The other semester abstracts management subjects: Communication, Sequence, Capacity, Critical Path, and Leadership. As part of the development of this course we discovered a raft of meta-skills we now call "PINO" for Production Information Nuance, and Organization – also because Joe Pino teaches the classes, but mostly because the working name "Too Stupid to Teach" seemed like it wouldn't look right on a syllabus. The germ of the thing is here: Common Sense Items but you can think of it as "turn on the light" or "work on a table" or maybe even "walk and chew gun at the same time." I guess the real application to what you were asking is that this is intended to stimulate lateral thinking and to get people to look at themselves in context.

OSWALD. I swear to God the thought behind the OSWALD class is "help students question the status quo, think outside the box, and lead them to explore the larger questions." Another creature largely of Joe Pino, but also Anne Mundell our Design Coordinator and then to a lesser extent the rest of us OSWALD is intended to help people learn to think, challenge assumptions, broaden horizons, and form their own measuring sticks. Like P.I.N.O. above, OSWALD stands for –REDACTED-. For a while the course was called "&^$%&#$." The problem was that in development, as soon as we put a more conventional name on it like "charette" or "practicum" or "sandbox" we found that the name brought with it expectations. For our own ability to break the mold we had to come up with not only new content, but new language. As a sideline, the students are going NUTS trying to figure out what it stands for. I can't tell you what they're doing in there because it's the first time through and I am not one of the teachers. I know the first day was a sort of scavenger hunt taking them all around campus looking for clues. There's a day coming up where –REDACTED-. There was talk of having someone come in with no preamble and start teaching –REDACTED-. There's no course outline; in the university catalog it says "a course sophomore Design and PTM students have to take, bring tools." It's taught as an 8 week intensive, meeting five days a week. Are we hitting our target? Is it working? We don't know, but so far we're happy with where it's going. Evaluation will have to wait a few years I think.

There are other things that might fit into the vein we're discussing, but I think those are the biggest contributors. I should say too that we're not all in agreement about the validity of these initiatives. There's a big population that says "our people are already successful, why are we monkeying with this?" But to many of us it does seem essential.

So, that’s where the discussion is here. I apologized for the editing, but there are students that read this blog and things pertaining specifically to the OSWALDs that we don’t want to tip.

There are a couple more things I should mention too.

The season selection not only turned to “lab review” based on the needs of courses, but in a fairly shattering moment is also supposed to be the end of the service posture. By this I mean that nobody is ever supposed to have to do something with their students exclusively because another program needs it for their students. This is I think groundbreaking. My impression is that a fair number of design and technical programs really only exist as service providers to acting and directing. This really wasn’t the case at CMU, but we still often found ourselves supporting shows because someone else “needed” a show. Since the lab review doesn’t allow for something to happen that isn’t directly related to pedagogy, if one group needs a show, and the other group doesn’t have someone for whom that production experience is manifestly constructive we're supposed to hire the missing piece rather than coerce someone into a service assignment. So far for one show or another we’ve hired designers, technical heads, technical crews, and even actors (we’d been hiring directors all along for another reason). It’s proving a tough transition culturally, and it is playing havoc with budgeting, but I think it is so special I sometimes can’t believe we managed to get here. While this doesn’t specifically relate to the idea of innovation regarding artistic development, I think it is absolutely groundbreaking with regard to Drama education.

I should also add for my Dramaturgy colleagues that there is a second component to the lab review to build on top of the nature of the pieces. We’re also charting each production against a rotating checklist of sorts guaranteeing that within a three year window students see something (if not a fairly equal representation) from several specific categories which I will now forget, but I think I might be: Classical Antiquity, Renaissance, Post War, Modern Drama, and World Stages. We’re told by our literature faculty that the investment in tying dramaturgy to season is fairly atypical, happening in something less than 5% of programs.

Probably worth mentioning as well was that the idea for the creation of the News From the “Real World” page and the reading requirement were also a direct result of the strategic plan and the curricular review. So in some small way an individual commitment to innovation was what made this discussion possible.

For me though, I think, we’re only just beginning. We still haven’t really figured out how to implement many of the decisions we made, we’re far from comfortable with the implementations we’ve undertaken, we’ve got two more years of classes to revise – and then the grad program to look at, and even then it could be years before we get any real indication of if the things we’re doing are having a positive effect. But I think this is a good thing. Although it has fostered quite a bit of turmoil in our school, and made for a lot of work for many of us I believe that the commitment to leadership demands that turmoil and work; and if we don’t get to stop, and have to keep adjusting that those adjustments are the process of innovation at work in our program. Even though they are tough, these are probably all things to be embraced.

Saturday, September 15, 2007

Bio Revising Time

Amongst the 800 things I am supposed to write this weekend is an updated bio. I hate writing these things, all the third person makes me feel like a rapper: Who's the professor? David Boevers is the professor. Also I think that no matter who you are and what you've done, you always know while you're writing that the thing sounds more impressive than it really is.

Anyway, how'd I do?

David Boevers is a professional theatrical Technical Director and entertainment project manager. He has been an alumnus of Carnegie Mellon Drama for over 15 years, a Professor of Drama for seven years, and the Option Coordinator of Production Technology & Management for five.

Currently David teaches the AutoCAD portion of Studiocraft and Studiocraft II, Basic PTM, Technical Direction, and Technical Design II as well as coordinating Stagecraft and PTM Thesis. Previously he has also taught Introduction to Production, Production Planning, Computer Applications – AutoCAD, Rigging Seminar, and Technical Design. David has also been an instructor in, and coordinator of, the Design & Technical component of CMU’s Drama Pre-College program, teaching Drafting, Technical Production, and Stagecraft.

Professor Boevers is a Project Leader for Commercial Theatre Outreach for the Technical Production Commission of the United States Institute of Theatre Technology. In addition to USITT, David has been active in ESTA and the ETCP working with the latter as a Subject Matter Expert during the development of the entertainment industry’s first certification program. He was a member of the first class of ETCP Certified Theatrical Riggers and the number on his “ETCP Recognized Rigging Instructor” card is four.

While a faculty member at the School of Drama, David has worked on projects for The Three Rivers Cultural Trust, Chicago Scenic Studios, Sapsis Rigging, The Carnegie Museum of Art, and for Showmotion Inc. on Broadway productions and national tours of “Into the Woods”, “Aida”, and “Thoroughly Modern Millie” among other projects. David also proudly serves on the Artistic Advisory Board of the family business, Apple Tree Theatre in metro Chicago.

Between the student and faculty stints at Carnegie Mellon, David worked for a wide range of organizations including Chicago Scenic Studios, Cirque du Soleil, and The Effects Network on many diverse projects including the 1996 Democratic National Convention, the Chicago Symphony’s ECHO center, the Bellagio Casino’s “O” show, trade show and store displays for Steve Madden, and the Paris Hotel/Casino’s Millennium display.

David is a graduate of Carnegie Mellon Drama where he received a BFA in Drama – Technical Production and the West Coast Drama Alumni Clan Gerald Adler award for outstanding production, and a graduate of the Yale School of Drama where he received an MFA in Drama – Technical Design & Production and the US NEH Jacob Javits Fellowship. He has had articles published in national publications such as Lighting & Sound America, Yale Technical Brief, and USITT Sightlines. David is a USITT Tech Expo award winner and has also served as a co-editor of the Technical Expo catalog on multiple occasions.

Friday, September 14, 2007

Do You Like Apples?

How do you like them apples? It's not for real yet, but its come a long, long way from where we were.

Sunday, September 09, 2007

Still the Same


I went to see Genesis tonight. The last time I said that was in October of 1986. Tonight Phil Collins at one point said "Is anyone here old?" Not just him it turns out.

In 1986 I saw the band at the Rosemont Horizon. I think the Horizon is now the Allstate Arena. I went with Cami; my dad drove. It's not that it was so long ago that I didn't have a license, but rather that the concert was in Chicago and I was in Pittsburgh. My next door neighbor in Schlag, Dave from Buffalo drove me to the airport. We got stuck in tunnel traffic and then an accident on Green Tree Hill. I missed my plane. I did manage to get on the next flight, but that got me to Chicago maybe 10 minutes before the show started. My dad had Cami and was picking me up at the airport on the way to the show. At some point he had to decide to wait for me or take her to the show - so he took her to the show. In what can only be described some serious father/son telepathy upon arriving at the airport I called my grandparents and asked to be picked up and taken to their house. Not more than five minutes after we got there my Dad showed up - and all without cell phones. He took me to the show, I got there in the middle of the first song. Finding my seat is one of the most memorable images in my life, walking up to Cami when she wasn't expecting me to show up. She had this huge smile and was wearing this multi-colored striped sweater - an image I'm not likely to forget. For that show we were in the balcony, behind the stage, but it was still cool. Genesis was the hugest thing ever that year. That show was one of like seven they had sold out in Chicago - my mom had actually stood in line to get me seats.

Things have changed a little. I got these seats online, last week. The band only has the one date in Pittsburgh. The room looked sold out, but if there were seats available a week ago it couldn't be that hot a ticket. Maybe the price had something to do with it. I think this show was more expensive than last time, and last time included a round trip plane ticket. The seats were on the floor, right on center in row AA. I've gotten used to closer through the MLE Fanclub, and even though I am sure the people 20 rows forward saw a totally different show, for spur of the moment I wound up with really good seats.

The show started real late. It was supposed to go at 7:30, but went at like 8:05. I'm to a point now where that's a little bit professionally embarrassing. No call to have a Sunday show go off late. I think they played until after 10:30. I was expecting a fairly tight 90 minute set. There were a couple of times I thought the show was over that it turned out not to be. Finally when it was, the fireworks were a little bit of a giveaway.

I could have done without No Son of Mine and I Can't Dance. I missed Duchess and Misunderstanding. But getting to hear In the Cage/Afterglow live made it worth it - I could even forgive the people behind me who talked through the entire show. I was hoping they would have complained to me after the show about standing so much, then I could have told them that I only waited for this show 21 years and then got to listen to them talk through it. Somehow I don't think they would have cared much. They played Ripples, which I wasn't expecting and closed with The Carpet Crawlers which was just like getting to go to hear the recording of Seconds Out. I remember Tonight, Tonight, Tonight, In the Glow of the Night/Domino, Land of Confusion, Mama, Home by the Sea/Second Home by the Sea, Throwing it all Away, Follow you Follow Me. There were definitely parts of Supper's Ready, Slippermen, Squonk, and Cinema Show. The drum duet started on a stool this time before wondering back to dueling kits.

Really the only downside was that its been so long since I have had this band in my regular rotation that I needed maybe half the show to remember what they were like. If you're going to another show, this will sound stupid, but warm up - listen to an album or two first. In the Cage was like the third tune they played. I wasn't really ready to appreciate it.

The production was nice. The sound was good, although there were things missing from the mix to my ear. The video was decent and not obtrusive - Mrs TANBI would have like the screens to have hung higher. The lights were what you would expect from Genesis, not a single conventional fixture - made me remember why I'd sent all those letters to Vari-Lite in the 80's.

The people were a lot older. There wasn't any smoking, and in stead of holding up lighters people were snapping pics with camera phones. Mine came out mostly blobs, but a guy in front of me had a better camera and I gave him a card, so maybe I'll have some better pics later.

Wish you'd been there? They're selling recordings of individual shows now. Doesn't even cost all that much. Check it out.

Although I am not a Big Fan...

can you do me a favor? can you put something up on your website or the ptm clearinghouse website asking for anyone who previously participated in growing theater as a grad or undergrad to contact me? i'm helping anne collect data for a grant, and i have some information but i'm sure there is more out there that i'm missing. i'm specifically looking for anyone who went on to work in education or outreach in some capacity after graduation.

also, did you see my article in pittsburgh magazine this month? ha ha

--
Andrea Shockling
shockling@gmail.com

Saturday, September 08, 2007

Blahs

Just can't seem to find the groove lately. It must be out there. Its not about working or not working, or home or not at home, or sleeping or not sleeping. I don't know what it is about. All I really know is it's off.

That just about defines the blahs, yes?

I have early September Blahs, not to be confused with the late September Dogs.

Maybe it'll pick up over the weekend. Or not.

Yup, that's blahs.

Blah.

:-I

Thursday, September 06, 2007

She's My Hero

MELISSA ETHERIDGE - ETHERIDGE ATTACKS SKINNY PARTY GIRLS: "Rocker MELISSA ETHERIDGE has lashed out at Hollywood's skinny stars because they continue to promote the sick message that rich and thin equals success and happiness."

Tuesday, September 04, 2007

Ellipses...

Ticketmaster is so greedy they charge you $2.50 to print your own tickets... It got humid again... That sure is one comfy chair we bought... Can there be any doubt that whatever the official report says the administration will interpret it to be exactly what they want? I think not... I watched some pool play and the semis for the FIBA Championship of the Americas. The finals were on another network, one I don't get... I guess it's true, if there won't be a quiz, people won't do it... I hope Tim Gunn's show is good. It'd be a real shame if it sucks... I don't think I care what Apple announces tomorrow... We're back in the brother-in-law's fantasy football league this year. Confidence isn't very high... Someone ought to pay me for the time I spend shredding mail I don't want. They should pay you too... I can't make the DVR do what I want, although I have a sneaking suspiscion that if it were a TIVO I could... Gallactica mini-sodes are an unfair assault on loyal viewers... All the dining services on campus are open again. I was probably better off when they weren't... Is it wrong to not do something when not given a due date? I'll have to think about that... Brey'tak REALLY needs brushing... Congress is back in session. I feel better already. Not... Really I need to do something about our driveway... I wonder if I would enjoy being in OSWALD... All the mortgage stories on the radio are making me real nervous... I gave a book to my boss today. I hope she doesn't think it sucks... We got the "Forbidden Lego" book today. It's cool, but I think I was expecting more... I got the cats a "litter robot." So far they only trust it for #1. I wonder what that's about... I hope everyone had a good labor day weekend...

Sunday, September 02, 2007

Reasonable Stopping Point

One of the hardest things to do in any home improvement project is to find the line. There's a point where this project ends and the next one begins. If you're not careful, buying a piece of furniture can turn into a major remodel with structural. Today we seemed to see a reasonable stopping point in our current project and we jumped at it. It's not like we're completely done, but it should be something that can be finished in its own time without any kind of blitz.

To review, we were converting "the Superman room" which used to be Mrs. TANBI's office into something that could be a more comfortable guest bedroom, but would primarily be used as a reading/sitting room. Also, the idea centered around a set of shelves I found online.

So, here's the funhouse photo of where we started. That's the web-slinger, the Dark Knight, and the Man of Steel if you're keeping track.

Then we have me dispensing with Superman. Just call me Lex-Paintor. No, on second thought don't call me that.


Two coats of Kilz to get rid of the super heros, then two coats of color - but first a bunch of masking. We hadn't done a green room yet. This photo is a little more funhouse.

Painting done, I go to the shop for 48 hours to fabricate the shelving unit. Then we ship it to the house and do another 8 hours of installation and paint touch up. I've already published the installed shelving photo.

I should say something about the shelves. First up, you don't save any money doing these yourself against buying something from IKEA. So if all you want are shelves, this is the wrong way to go. Costwise that assumes you are painting and can use #2 pine. If you plan to stain and want to go d-select or to poplar then this is a real expensive set of shelves.

It's also a lot of parts to keep track of. There are 24 pieces, and when you consider which edge you want to be forward (so you can get the best face out) then they are all different. Even being fairly anal and labeling a drawing and every single piece I still had a few confusing moments. All of the cross joints are eggcrated half-laps. I did these in the shop using a router, a 1/4" mortising bit, and a spacing jig. The set up is crucial, because if one slot is off a whole board is trash. That part of the process was actually pretty simple, but nerve-wracking.

I did the painting prior to assembly so I could roll it on flat. This worked real well. I can't imagine how aggravating it would have been doing all of the cubbies if it were already assembled. The one down side, if there is one, was that the latex paint really didn't want to cure. Even with a full 24 hour dry time the boards still didn't want to be stacked to ship, and every little particle of dust stuck immediately. Painting pine just isn't the same as painting walls, and the paint behaves differently.

The install has a few wrinkles. The parts are big, and delicate, so maneuvering everything in the tight confines of the room is somewhat difficult. You wind up having to lay everything out face down and do the boards running one way roughly spaced and just sitting on edge - hoping nothing will fall over. This isn't too tough on the first cross where you only have to make three joints. Making eight is another story. I gave up gluing after two boards. First, the glue was getting all over everything. It would drip on the floor, or I would brush it on and the board would fall over - it just wasn't meant to be. Second, although the joints were fairly loose in the shop, after two coats of paint and a change in humidity everything was a fairly tight press-fit. I figured that, plus the still curing paint would be enough. I could be wrong, only time will tell. On making eight joints simultaneously; it's possible to do this with one person, but if I did it again I would want three.

Believe it or not, there is a squareness issue to be dealt with here. Although the entire piece is like one big diagonal brace, until you attach the side pieces it is possible for the thing to squish more one way than the other. I'm fairly certain that I got this wrong, as the final height of my piece is not what it should be according to the drawing. Truthfully I don't know where the height went. Also, I have one real lousy corner for square - and then the walls turned out to not be plumb or true to the floor, so even if I had been spot on it would have still made an ugly spot when it came to installation. This is one aspect of in-home work that I will never prefer to building scenery. All the matching and templating seems much more difficult than what we get to do on stage.

I didn't think of a very good way to attach the side pieces. When I started the project I ordered a compressor and a pneumatic brad gun. They arrived the Monday after I finished the install, so my original plan to use brads sorta had to be revised. In the end I used drywall screws for everything. I pre-drilled every hole to keep from having splits. Also, on the door side stile I screwed the piece on from the inside out. It made some holes in the cubby, but it left the exposed side with no visible fasteners. Probably more work than it was worth. Anyway, these joints are probably the weakest in the whole piece. They are true toe-screws without much wood to hold them. You can see just a little bit in the photo above how I was unable to use this to suck the perimeter boards flush to the interior pieces. I guess some of those boards were cupped a little. It might have been worth it to use d-select for those - or it might have been more expensive without making any difference. If I ever build another set maybe I'll try that.

Finally, I broke two boards during the install. From the start I was concerned about the 1x12 holding together between the slots. In those regions it just sort of a six inch deep tab sticking out unsupported. Anyone that's done some carpentry will know that configuration is just itching to split. I cracked off one piece while somewhat indelicately smacking it to try to line up a joint. The second one I broke while I was walking across the back of the unit laid out on the floor - works fine for flats or platform frames, less so with 12 inch deep shelves with 6" free hanging pieces. Fortunately both breaks were real clean, took glue well and went back together with a couple of nails installed sort of in pocket holes. You can see above one of the shelves dressed with JC to cover this repair. The 1x12 appears to be more than enough to handle the weight of the books without breaking, but were an enterprising youngster to attempt to summit the piece several shelves would likely be lost in the effort. I'm considering using the late arriving air tools to retro-brad every one of the shelves in that configuration. But I'm not sold on it yet.

Anyway, it looks a lot better after paint touch ups and with books.

We haven't moved all the books in, but I think we'll have just enough room to not have room for any more books. The alternating direction of stacking comes from the original photo research. I personally feel like it dresses up the piece, but opinions vary.

Anyway, here's the most funhousiest picture yet showing the current state of things.

The painting is done and the shelves are done. We also remodeled the inside of the closet, doing two oversized shelves for those ubiquitous plastic bins. We're leaving the desk for the time being, but it is destined for another room now, to be replaced by an armchair, ottoman, and an end table. We purchased a reclining love seat from a local furniture clearance center and scavenged a lamp from our living room to come right up to the line. So there's still things to be hung on the wall, and a little more furnishing to do, but overall this project is complete. And I think pretty cool - although it's no Superman room.

Saturday, September 01, 2007

Well Wishes

Dad had his second back surgery today. My thoughts are with him rather than here. Your well wishes are appreciated.